Milestones

Dated deliverables across all seven modules

Each module carries a fixed set of dated deliverables. Status is updated as evidence is filed against the milestone gate — delivered, in progress, or scheduled.

Tracked deliverables

36

Delivered

17

In progress

8

Scheduled

11

M01

3/6 delivered

NEXUS Core

Foundation model and inference engine

  1. Complete

    Training cluster commissioned

    Dedicated training fleet installed, benchmarked and handed to the research team.

  2. Complete

    Scheduler lifts utilisation to 91%

    Sustained cluster utilisation moved from 68% to 91%, cutting cost per training token.

  3. Complete

    13B pilot clears reasoning gate

    Pilot checkpoint passed all twelve blocking evaluations including multi-step tool use.

  4. In Progress

    70B production pretraining run

    Full mixture-of-experts production run against the curated SENTRA corpus.

  5. Scheduled

    Long-context extension to 512k

    Context window extension validated on retrieval and long-document reasoning suites.

  6. Scheduled

    Model contract SDK 1.0

    Python, TypeScript and gRPC SDKs frozen at 1.0 with edge-target expert routing.

M02

3/5 delivered

SENTRA

Data ingestion and synthetic corpus pipeline

  1. Complete

    Ingestion and dedup cluster live

    Petabyte-scale pipeline stood up with near-duplicate detection in the hot path.

  2. Complete

    4.2PB licensed corpus normalised

    Licensed and permissive sources ingested, scored and curriculum-ready.

  3. Complete

    Provenance ledger in production

    Every document carries a signed licence attestation and lineage hash into checkpoints.

  4. In Progress

    Synthetic reasoning corpus v1

    Policy-constrained synthetic generation covering scarce industrial domains.

  5. In Progress

    Multilingual expansion, 12 languages

    Corpus and quality scoring extended across twelve additional languages.

M03

2/5 delivered

ORACLE

Multimodal reasoning and vision stack

  1. Complete

    Encoders integrated with 13B pilot

    Image and document encoders sharing the NEXUS token space in one context.

  2. Complete

    Region-level citation prototype

    Document answers cited back to the source pixel region at 94% span accuracy.

  3. In Progress

    Video temporal reasoning adapter

    Frame-sequence adapter for inspection and process-monitoring workloads.

  4. Scheduled

    Sensor and time-series fusion

    Industrial telemetry fused into the shared reasoning context.

  5. Scheduled

    Chart and schematic benchmark suite

    Public-facing evaluation suite for engineering drawings and charts.

M04

2/5 delivered

HELIX

Autonomous agent orchestration layer

  1. Complete

    Execution engine alpha

    Durable engine running multi-day workflows across restarts without state loss.

  2. Complete

    Tool registry at 60 integrations

    Typed schemas and permission scopes across internal and third-party tools.

  3. In Progress

    Multi-agent hand-off protocol

    Negotiation and delegation between agents with a single replayable trace.

  4. Scheduled

    Cost and budget governor

    Per-workflow spend ceilings with escalation to human approval.

  5. Scheduled

    Failure-recovery planner

    Automatic retry strategy selection and compensating actions on partial failure.

M05

3/5 delivered

AEGIS

Safety, alignment and compliance framework

  1. Complete

    Red-team harness gates releases

    Automated adversarial suites block promotion on regression.

  2. Complete

    ISO/IEC 42001 control mapping

    Full control set mapped and internally reviewed ahead of external assurance.

  3. Complete

    Policy engine enforcing in staging

    Per-tenant inference-time rules live across the staging environment.

  4. In Progress

    EU AI Act evidence automation

    Automated generation of the evidence bundle enterprise procurement requires.

  5. Scheduled

    Third-party assurance readiness

    External audit readiness across the mapped control set.

M06

2/5 delivered

VERTEX

Edge deployment and compute fabric

  1. Complete

    3B distillation prototype

    Distilled model reaching 88% of pilot-model task quality on constrained hardware.

  2. Complete

    Scheduler design review

    Fabric architecture reviewed and signed off with two launch partners.

  3. In Progress

    Cross-accelerator bin-packing

    Heterogeneous scheduling across reserved, spot and on-premise capacity.

  4. Scheduled

    Signed offline update channel

    Air-gapped deployment bundles with signed model updates.

  5. Scheduled

    8GB-class quantisation toolchain

    Edge quantisation pipeline released with fleet telemetry.

M07

2/5 delivered

ATLAS

Enterprise interface and integration suite

  1. Complete

    Five design partners signed

    Cohort covering logistics, utilities and financial services validating the workspace.

  2. Complete

    Metering schema finalised

    Usage schema locked against the inference fabric ahead of billing build.

  3. In Progress

    Admin console and tenancy

    Multi-tenant management, roles and quota administration.

  4. Scheduled

    First eight enterprise connectors

    Connectors into the major systems of record used by design partners.

  5. Scheduled

    Developer portal and public SDK

    Public API, SDKs and usage-based billing generally available.

Automated investor notifications

Subscribe to email updates

Get notified the moment a milestone is marked delivered or a new investor report is published across the seven modules. No marketing — programme updates only.

Notify me about

Want the evidence behind a milestone?

Evaluation logs, benchmark runs and delivery notes are shared with investors on request for any milestone marked delivered.

Request evidence pack