Milestones
Dated deliverables across all seven modules
Each module carries a fixed set of dated deliverables. Status is updated as evidence is filed against the milestone gate — delivered, in progress, or scheduled.
Tracked deliverables
36
Delivered
17
In progress
8
Scheduled
11
M01
3/6 deliveredNEXUS Core
Foundation model and inference engine
- Complete
Training cluster commissioned
Dedicated training fleet installed, benchmarked and handed to the research team.
- Complete
Scheduler lifts utilisation to 91%
Sustained cluster utilisation moved from 68% to 91%, cutting cost per training token.
- Complete
13B pilot clears reasoning gate
Pilot checkpoint passed all twelve blocking evaluations including multi-step tool use.
- In Progress
70B production pretraining run
Full mixture-of-experts production run against the curated SENTRA corpus.
- Scheduled
Long-context extension to 512k
Context window extension validated on retrieval and long-document reasoning suites.
- Scheduled
Model contract SDK 1.0
Python, TypeScript and gRPC SDKs frozen at 1.0 with edge-target expert routing.
M02
3/5 deliveredSENTRA
Data ingestion and synthetic corpus pipeline
- Complete
Ingestion and dedup cluster live
Petabyte-scale pipeline stood up with near-duplicate detection in the hot path.
- Complete
4.2PB licensed corpus normalised
Licensed and permissive sources ingested, scored and curriculum-ready.
- Complete
Provenance ledger in production
Every document carries a signed licence attestation and lineage hash into checkpoints.
- In Progress
Synthetic reasoning corpus v1
Policy-constrained synthetic generation covering scarce industrial domains.
- In Progress
Multilingual expansion, 12 languages
Corpus and quality scoring extended across twelve additional languages.
M03
2/5 deliveredORACLE
Multimodal reasoning and vision stack
- Complete
Encoders integrated with 13B pilot
Image and document encoders sharing the NEXUS token space in one context.
- Complete
Region-level citation prototype
Document answers cited back to the source pixel region at 94% span accuracy.
- In Progress
Video temporal reasoning adapter
Frame-sequence adapter for inspection and process-monitoring workloads.
- Scheduled
Sensor and time-series fusion
Industrial telemetry fused into the shared reasoning context.
- Scheduled
Chart and schematic benchmark suite
Public-facing evaluation suite for engineering drawings and charts.
M04
2/5 deliveredHELIX
Autonomous agent orchestration layer
- Complete
Execution engine alpha
Durable engine running multi-day workflows across restarts without state loss.
- Complete
Tool registry at 60 integrations
Typed schemas and permission scopes across internal and third-party tools.
- In Progress
Multi-agent hand-off protocol
Negotiation and delegation between agents with a single replayable trace.
- Scheduled
Cost and budget governor
Per-workflow spend ceilings with escalation to human approval.
- Scheduled
Failure-recovery planner
Automatic retry strategy selection and compensating actions on partial failure.
M05
3/5 deliveredAEGIS
Safety, alignment and compliance framework
- Complete
Red-team harness gates releases
Automated adversarial suites block promotion on regression.
- Complete
ISO/IEC 42001 control mapping
Full control set mapped and internally reviewed ahead of external assurance.
- Complete
Policy engine enforcing in staging
Per-tenant inference-time rules live across the staging environment.
- In Progress
EU AI Act evidence automation
Automated generation of the evidence bundle enterprise procurement requires.
- Scheduled
Third-party assurance readiness
External audit readiness across the mapped control set.
M06
2/5 deliveredVERTEX
Edge deployment and compute fabric
- Complete
3B distillation prototype
Distilled model reaching 88% of pilot-model task quality on constrained hardware.
- Complete
Scheduler design review
Fabric architecture reviewed and signed off with two launch partners.
- In Progress
Cross-accelerator bin-packing
Heterogeneous scheduling across reserved, spot and on-premise capacity.
- Scheduled
Signed offline update channel
Air-gapped deployment bundles with signed model updates.
- Scheduled
8GB-class quantisation toolchain
Edge quantisation pipeline released with fleet telemetry.
M07
2/5 deliveredATLAS
Enterprise interface and integration suite
- Complete
Five design partners signed
Cohort covering logistics, utilities and financial services validating the workspace.
- Complete
Metering schema finalised
Usage schema locked against the inference fabric ahead of billing build.
- In Progress
Admin console and tenancy
Multi-tenant management, roles and quota administration.
- Scheduled
First eight enterprise connectors
Connectors into the major systems of record used by design partners.
- Scheduled
Developer portal and public SDK
Public API, SDKs and usage-based billing generally available.
Want the evidence behind a milestone?
Evaluation logs, benchmark runs and delivery notes are shared with investors on request for any milestone marked delivered.
